New beam over window

Enclosed sack hoist

Panelling to display area

The decision was made to increase floor space by replacing the floor to the bin floor, this works revelled the rotten beam over one of the windows on the stone floor. Work was carried out to replace this before the floor could be installed.

 

The bin floor is now accessible to the public to view the sack hoist and see our displays.